With the evolution of technology, it became necessary to upgrade existing equipment cabinets. In addition to this, as older contracts ended, new customers were added to the work stream.
Racetech and Virgin Media were two new customers that had a need for equipment cabinets to be installed, with Racetech having just the chassis installed and Virgin Media having a populated equipment cabinet fitted, with the installation of back up batteries performed on site.
Both customers requiring work nationwide.